Two GJQ-S-1000 units; concentration factor up to 5.24x; client repurchased and upgraded in 2019.

CHALLENGE · SOLUTION · RESULTS

Project Overview

Challenge

The waste-heat power circulating water system had a high heat load and fast scaling and microbial growth. Heavy chemical dosing was required, the concentration factor was hard to raise, and makeup / blowdown costs remained high.

Solution

Two high-capacity GJQ-S-1000 units were installed in parallel with automatic scraping, and operating parameters were adjusted based on LSI / RSI indices.

Results

The Langelier index has been stable at 0–2 and the concentration factor reached up to 5.24, with stable long-term operation. The client repurchased and upgraded the system in 2019.

Shandong Lushenfa Chemical Project site
5.24×Concentration factor
2 unitsUnits in service
2019Repurchase
Request a Similar Solution
REQUEST A SOLUTION

Send Us Your Circulating Water Challenge

Share your flow rate, water quality and system type. Our engineers will respond with a selection proposal and ROI estimate within 24 hours.

Phone +86 138 5316 6316 WhatsApp WeChat 15820006913 · click to copy Email sdhaineng123@163.com
Call WhatsApp WeChat Email